Project details
The designing were carry out for in addition to the 2 pools of 3000m³ that are currently in use, four new pools of 6000m3 will be built and the project will be expanded to a total volume of 30000m3.
Urban construction and engineering supply
The designing were carry out for in addition to the 2 pools of 3000m³ that are currently in use, four new pools of 6000m3 will be built and the project will be expanded to a total volume of 30000m3.