Project details
The designing for connecting the households of the 3rd, 4th and 5th Bags of Kherlen Sum, Khentii province to the centralized engineering network /3 heat sources, 31.5 km long water and heat supply lines, 28.7 km long sewage lines, 3 electricity substations piece/ were developed.