Engineering infrastructure work design for the reconstruction of the building that does not meet the requirements for use on the 1st, 2nd, 3rd, 4th, 5th, 6th, 7th, 8th and 9th floors of the 4th district of Bayangol District

Urban construction and engineering supply

Project details

Design of the engineering infrastructure in accordance with 10.1.4 of the Law on Construction of Mongolia were developed for connecting the drainage system to the new and existing dams, to be supplied from the centralized power supply network, connecting fresh and waste water to the centralized water supply and sewer lines, to pedestrian and public areas.