Project details
Design of the engineering infrastructure in accordance with 10.1.4 of the Law on Construction of Mongolia were developed for connecting the drainage system to the new and existing dams, to be supplied from the centralized power supply network, connecting fresh and waste water to the centralized water supply and sewer lines, to pedestrian and public areas.