Within the project, a 4.4 km long water and heat supply line, a 3.9 km long sewage line, a 1.1 km main water supply line, an external power supply, a water source, and a sewage pump station were completed.
Urban construction and engineering supply
Within the project, a 4.4 km long water and heat supply line, a 3.9 km long sewage line, a 1.1 km main water supply line, an external power supply, a water source, and a sewage pump station were completed.