Project details
Designing for wastewater treatment plant, sewage pressure double line L=1794m, non-pressure self-flow line L=2717m long line of Sainshand province were developed.
Urban construction and engineering supply
Designing for wastewater treatment plant, sewage pressure double line L=1794m, non-pressure self-flow line L=2717m long line of Sainshand province were developed.