Project details
Designing of a 6.4 km water supply line with a diameter of 200-300 mm and a 6.6 km sewage line with a diameter of 200 mm for the service center of the auto trade complex was developed.
Urban construction and engineering supply
Designing of a 6.4 km water supply line with a diameter of 200-300 mm and a 6.6 km sewage line with a diameter of 200 mm for the service center of the auto trade complex was developed.