Project details
The designing and budgeting for engineering infrastructure network of the 26 buildings planned to be built at the new border port was planned and developed. The project also provides for solving the problems of solid waste, liquid waste, and hazardous waste in accordance with the possible conditions of the port. The border port currently operates on an area of 4 hectares, but according to the new planning, it is planned to have buildings and structures on an area of 12.5 hectares, and roads on an area of 5.6 hectares.