Project details
Within the project, in order to protect the ecosystem of Terkhi Tsagaan Lake, it is planned to build 65.9m and 71.9m overflow low-tide concrete port and 65.9m wide threshold spillway to increase the water level of the current lake by 1m. Also, a flood protection dam, a road drainage, and a stone-lined channel were planned.