Develop the technical feasibility study on the "Inculcation of technology for thickening waste from the concentration plant"

Mining and industry

1 / 5

Project details

Within the technical feasibility study for the introduction of tailings thickening technology at the concentration plant, a tailings thickener with a capacity of 40 million tons per year, a thickened tailings pumping station, a water purifier for molybdenum concentrate, a settling pool, a circulating water pumping station, and transmission lines for various purposes were comprehensively planned.