Project details
For the water supply of the 9th bag of ger dictrict household center in Dalanzadgad soum, Umnugovi aimag, a 6,096 m HDPE SDR11 plastic pipeline, 29 prefabricated reinforced concrete inspection wells, and 4 culvert wells have been constructed and installed.