Construction and installation work of water distribution line-1,2 and water distribution branch line-1,2 of the second source of drinking water in Dalanzadgad soum.

Construction and Installation work

1 / 3

Project details

For the water supply of the 9th bag of ger dictrict household center in Dalanzadgad soum, Umnugovi aimag, a 6,096 m HDPE SDR11 plastic pipeline, 29 prefabricated reinforced concrete inspection wells, and 4 culvert wells have been constructed and installed.