Project details
Within this work a new 6,000 m3 dual biopond, a 665.6 m protective fence, and a 626 m flood protection channel were constructed at the central treatment plant in Khanhongor soum, Umnugovi aimag. Additionally, eight inspection wells and barrier structures for the sewage line underwent significant repairs.